Welcome to Hubei Kuruidi Intelligent Equipment Co., Ltd!
Hotline:13797980475
Product classification

Hubei Kuruidi Intelligent Equipment Co., Ltd

Contact phone number: 13797980475

Address: Tangyan Avenue, Jingshan City, Hubei Province

Your current location:Home > News information
What are the key points for installing an automatic feeding machine?
Date:2025-06-11    Clicks:22

1: After the machines are transported to the customer's factory, they should be arranged in a straight line, and the two sections should be connected with screws, paying attention to the consistency of height. At the same time, the center line of the machine should be adjusted to be consistent with the center line of the mold.

2: In terms of wiring: Connect the previously removed wires one by one (according to the number tube), paying attention to the installation sequence of the sealing plate before and after. Reminder: The 4 sleeves coming out of the large electrical box should be paired one by one with the encoder wire plug, pulse wires Y0, Y1, 11,12, NC feeder motor wire, and large sleeve pipeline.

3: After installing all the circuits, please double check if they are installed properly and completely. After confirmation, install the machine seal board (precision leveling machine).

4: After confirming that the power switch of the electrical box control panel is in the disconnected state, turn on the power supply (3-phase 380V), turn on the power switch, confirm if it is normal, and immediately cut off the power if there is any abnormality.

5: Operate the control handle and press (rack up) or (rack down) to adjust the material discharge height to be level with the mold. Be careful to loosen the screws of the NC feeder frame, otherwise the action will be ineffective. (There are three limit switches, the top limit switch is the main control, the middle limit switch is the upper limit, and the bottom limit switch is the lower limit.)

6: Finally, connect the feeding and relaxation signal lines of the machine to the punch press (three lines X7, X4, COM), and also connect the emergency stop line (two lines 65 and 66) as needed.

7: After everything is confirmed to be normal, the three in one feeding machine can enter normal production. Pay attention to safety and regularly check and add lubricating oil.